This floor was covered with undelayment and carpets. Left kitchen and right entrance area was covered with tile over concrete slab.

tile_removal_01.jpg

 

Removed tile and thinset from concrete slab but the floor levell is very bad.

tile_removal_02.jpg

 

Appearing one rebar on the entrance right side.

tile_removal_03.jpg

 

Completed with levelling cements on only iregualr concrete floor area after cutting off a rebar.